Sustainable Design The proposed structure will not take away from the Red Hook waterfront but will add a wonderful green space to be enjoyed by all visitors. Some of the key features are green roofing found on only 30% of the site which contains the structure for build, as the other 70% will be used as working landscape. The working landscape is one of the best features because it helps the site as well as the proposed structure. Embedded into the landscape, there are water drains that lead to a water tank about 20' below grade. This water tank traps almost all rainwater on the site and is filtered to be recycled within the proposed structure. Due to the recent levels of rainfall in New York City, this process will be very Eco- friendly as well as energy efficient. On the structure, which consist of the remaining 30%, there is a green roofing system. With this green roofing system, it will work as a insulator for the structure and will absorb the sun rays on the structure. (Please refer to section below for more details.) Design Concept The design behind this structure was all about being energy efficient and giving the Red Hook area a place that is multi-use. In New York City, it is very hard for designers such as artists, architects, photographers, etc to find large or even small space to develop their creative genius.
Monday, May 19, 2014
Sustainable Design
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment